air construction permits

Companies doing business in Missouri may be regulated by the department under one or several Missouri laws and regulations. Permits are a necessary part of the environmental business because it is our first and best opportunity at assuring environmental protection and compliance. It is the department’s goal to make the permitting process as timely, protective and cost effective as possible. 

Master General Permits

Master general permits are issued to multiple locations where activities are similar enough to be covered by a single set of requirements to limit emissions and discharges. All facilities receiving a general permit must follow the conditions and pre-set limits contained in that general permit until it expires or until the facility obtains a site-specific permit.

Site-Specific Permits

Site-specific permits are issued to one location, on a case-by-case basis. They are written to be specific to that individual facility or location. These permits regulate what that facility can do and how they do it. Site-specific permits usually are most appropriate for regulating large or complex facilities and processes.

Department-issued Permits, Certifications, Registrations and Licenses

Whether you have an existing business or are planning a new business, we want to help you understand everything you need to know about the environmental permitting process. All environmental permits, certifications, registrations and licenses that the Missouri Department of Natural Resources issues are listed below. Select the permit title to find out more about that permit, including a general overview, permit length, applicable laws and regulations, how to apply, fees, timeline/ process, requirements, etc.

If you are not sure which permit(s) you may need, the department also organized these permits according to general area of focus or which ones a specific type of business may need.

Title Sort descending Areas of Focus Short Permit Description
State No-Discharge Concentrated Animal Feeding Operation (CAFO) Permit MOGS10000 Water » Wastewater;
Water » Concentrated Animal Feeding Operation

If your business is a Class I CAFO or Class II Animal Feeding Operation that are defined as a CAFO, you must obtain a State No-Discharge Concentrated Animal Feeding Operation MOGS10000 master general permit.

Surface Coal Mining Permit Land and Geology » Land Reclamation;
Land and Geology » Oil and Gas

If your business plans to excavate coal through surface mining operations or plans to reclaim a former mine site, you may need a Surface Coal Mining Permit.

Swimming Pools Discharge Permit MOG760000 Water » Wastewater

If your business plans to discharge filter backwash and pool drainage from swimming pools and lined ponds that use chlorine as a sanitizer, you must obtain a Swimming Pools Discharge MOG760000 master general permit.

Textile and Apparel/ Printing and Publishing Master General Stormwater Permit MOR130000 Water » Stormwater

If your business produces paper and allied products, textiles and apparel products, printing and publishing operations and paper-only recycling, food and kindred products manufacturing operations, you must obtain a Textile and Apparel/ Printing and Publishing General Stormwater Permit MOR130000 to address stormwater discharges from the property.

Treatment Works <50,000 Gallons in Lakes/ Reservoirs MOGD0000 Water » Wastewater

If you are a non-publicly owned treatment works that discharges less than or equal to 50,000 gallons of domestic wastewater per day into lakes or reservoirs, you must obtain a Treatment Works <50,000 Gallons in Lakes/ Reservoirs MOGD00000 master general permit.

Treatment Works Discharging < 50,000 Gallons Per Day to Rivers/ Streams MOGDS0000 Water » Wastewater

If you are a non-publicly owned treatment works that discharges less than or equal to 50,000 gallons of domestic wastewater per day into rivers and streams, you must obtain a Treatment Works Discharging <50,000 Gallons Per Day to Rivers/ Streams MOGDS00000 master general permit.

Trout Fishing Permit Agency/ General » Other

Missouri State Parks offers three parks to fish for trout. The streams at Bennett Spring, Montauk and Roaring River state parks are stocked every night. You may purchase your Trout Fishing Permit at the park store. For more information, please visit the Missouri State Parks' Trout Fishing Permit webpage.

Underground Injection Control Wells Permit Water » Wells and Drilling;
Land and Geology » Wells and Drilling

If you plan to operate a Class I or Class V well in Missouri, you may need to apply for an Underground Injection Control Well Permit. Class I wells are used to inject hazardous wastes, industrial non-hazardous liquids, or municipal wastewater beneath the lowermost underground sources of drinking water. Class V wells are used to inject non-hazardous fluids into or above underground sources of drinking water and are typically shallow, onsite disposal systems.

Underground Petroleum Storage Tank Registration Waste and Recycling » Hazardous Waste;
Waste and Recycling » Underground Storage Tanks

If your business includes an underground storage tank on the property used to store either petroleum or certain hazardous substances, or if you plan to have a tank installed for these reasons, you may be required to submit an Underground Storage Tank Registration with the department.

Wastewater Construction Permit Water » Wastewater

If your business plans to build, erect, alter or replace an existing or proposed point source, water contaminate source or wastewater treatment facility, you may need a Wastewater Construction Permit.

Wastewater Treatment Operator Certification Water » Wastewater;
Water » Operator Certification

If you would like to become a licensed wastewater treatment operator including a Concentrated Animal Feeding Operation Waste Management System operator, visit the department's Operator Certification webpage. The department can help provide you with training, examinations, funding vouchers to obtain certification and information about employment opportunities within Missouri. 

Water Treatment Plant Settling Basins Permit MOG640000 Water » Wastewater

If you own or operate a water treatment plant and plan to filter backwash water and solids, plan to operate a no-discharge sludge holding system, or plan to land apply sludge from the water treatment plant, you must obtain a Water Treatment Plant Settling Basins MOG640000 master general permit.

Wood Treaters Master General Stormwater Permit MOR22B000 Water » Stormwater

If your business includes a wood preserving and treating operation, you must obtain a Wood Treaters General Stormwater Permit MOR22B000 to address stormwater discharges from the property.

Yard Waste Compost Sites Permit MOG970000 Water » Wastewater

If your business owns a yard waste composting operation under 20 acres, you must obtain a Yard Waste Compost Sites MOG970000 master general permit.

Zeolite Softeners Permit MOG641000 Water » Wastewater

If your business plans to discharge backwash water from water softening units or discharge backwash from a zeolite filter, you must obtain a Zeolite Softeners MOG641000 general permit.