Permits are required to build, erect, alter, replace, operate, use or maintain existing point sources of water pollution. A master general permit is one permit issued to multiple locations where activities are similar enough to be covered by a single set of requirements. However, most wastewater permits are site-specific, meaning one permit is issued to one location to reflect the unique nature of that specific wastewater, stormwater or the receiving water. 

As a permit nears its expiration, it is redrafted, modified if needed and made available for public review and comment. The department reviews all public comments before making a decision about the permit. 

If a permittee submits a timely and sufficient application to renew a permit and, through no fault of the permittee, the department is unable to issue the renewed permit before the current permit expires, Code of State Regulations 10 CSR 20-6.015(10)(C) allows the permit to be administratively continued. The terms and conditions of the expired permit remain in effect until the department issues or denies the permit renewal. 

Currently Effective Permits

The following table contains electronic copies of all currently effective site-specific wastewater permits — not master general permits — issued by the department. This includes Concentrated Animal Feeding Operation (CAFO) permits, stormwater permits, wastewater permits and underground injection control well permits. These facilities have been authorized to either discharge to waters of the state, or to operate a no-discharge wastewater treatment facility. The department adds each site specific wastewater permit as it is issued. 

To sort the table below by field, click on the column headings in the table. You can also enter criteria in the search boxes to search for a specific wastewater permit. If you cannot find the information you are looking for, please submit an Open Records/ Sunshine Law Request.

*This is an "and" type search. All search criteria you enter must be met for the permit to appear in the results. If the permit you are searching for is not listed in the results, try again using less criteria.

Effective Date Between
Permit Number Applicant/ Facility County Effective Date Expiration Date Type
MOGC00784 Prairie Ridge Phase 1 Greene Construction
MO0042480 Billings Wastewater Treatment Facility Christian Operating
MO0082767 Butterball LLC Jasper Operating
MOGC00819 CIP#6 Lower Brookline and CIP#7 McElhane Greene Construction
MO0135593 Fastlane Taylor Wastewater Treatment Plant Marion Operating
MO0121371 Hunter's Ridge Subdivision Wastewater Treatment Plant St. Francois Operating
MOGC00822 Jackson Drive Industrial Park Jackson Construction
MO0134309 Keystone Estates Wastewater Treatment Plant Lincoln Operating
MOGC00821 Kinder Farms Subdivision Phase 1 Cape Girardeau Construction
MO0099040 Knolls Resort Condominiums Wastewater Treatment Facility Camden Operating
MOGC00820 Meadowbrooke Jackson Construction
MO0040461 Missouri-American Water Co.-Cedar Hill Lagoon Jefferson Operating
MO0129755 Missouri-American Water Company, Purcell Wastewater Treatment Facility Jasper Operating
MOGS10655 Nolt Farms LLC Moniteau Operating
MO0118559 Orchard Farms Apartments Wastewater Treatment Facility St. Charles Operating
MO0117595 Park Place on the Lake Condominiums Wastewater Treatment Plant Camden Operating
MO0118206 Pony Wastewater Treatment Facility, The Butler Operating
MO0110108 Skyhaven Motel and Convenience Store Wastewater Treatment Facility Johnson Operating
MO0081850 Skyline Village Inc. Wastewater Treatment Facility Audrain Operating
MO0102342 Southwood Shores Condominiums Wastewater Treatment Facility Camden Operating
MO0057312 Terre Du Lac South One Cell Lagoon St. Francois Operating
MO0125776 TT Sewer Co. Wastewater Treatment Facility Camden Operating
MO0060101 U.S. Army Corps of Engineers-Cedar Ridge Wastewater Treatment Facility Cedar Operating
MO0060089 U.S. Army Corps of Engineers-Ruark Northeast Park Wastewater Treatment Facility Dade Operating
MO0139912 Walnut Creek Mine Bates Operating
MO0124923 Whitetail Crossing Subdivision Wastewater Treatment Facility Taney Operating
MO0126853 Windgate on the Lake Condominiums Wastewater Treatment Facility Camden Operating
MO0102652 Wood Crest Condominiums Wastewater Treatment Facility Camden Operating
MOGC00796 Coastal Carriers Warren Construction
CP0002513 Completion of Construction Mid-Mo Equine and Livestock Center Saline Construction
MOGC00814 Summersville Wastewater Treatment Plant Shannon Construction
MOGC00804 Twin Pines Estates Jefferson Construction
CPSE01114 Rocky Mount Sewer District Phase 3 Morgan Construction
CP0002503 FCPWSD No. 1 Cobblestone Creek Estate UV Disinfection Franklin Construction
MOGC00800 Versailles Walnut to McNair Street Morgan Construction
MOGC00813 Kelby Creek Phase 4A Christian Construction
CP0002475 Clarence Wastewater Treatment Facility Lagoon Earthwork and Disinfection Shelby Construction
CP0002435 Cup Tree Road Wastewater Treatment Facility Camden Construction
CP0002508 Dixon Wastewater Treatment Plant Pulaski Construction
CP0002506 Edgar Springs Wastewater Treatment Plant UV Disinfection-Filter Replacement Phelps Construction
CP0002479 LaBelle Wastewater Treatment Facility Wastewater Treatment System Improvements Lewis Construction
CP0002469 Teck American Incorporated Magmont Operation Earthen Basin with BioReactor Iron Construction
CP0002480 Twin Pine Estates Jefferson Construction
CP0002413 Clever Wastewater Treatment Plant Facility Improvements Christian Construction
CP0002501 Corbett Lime Sludge Holding Basin Johnson Construction
MOGC00790 Stone Bridge Phase 3 Franklin Construction
CP0002484 Potosi Oxidation Ditch and Equipment Replacement Washington Construction
MO0029742 American Water Military Services-Fort Leonard Wood Wastewater Treatment Facility Pulaski Operating
MO0112810 Calypso Cove RV Park Wastewater Treatment Facility Cedar Operating
MO0139742 Estates of Woodlake Wastewater Treatment Facility Camden Operating