Permits are required to build, erect, alter, replace, operate, use or maintain existing point sources of water pollution. A master general permit is one permit issued to multiple locations where activities are similar enough to be covered by a single set of requirements. However, most wastewater permits are site-specific, meaning one permit is issued to one location to reflect the unique nature of that specific wastewater, stormwater or the receiving water. 

As a permit nears its expiration, it is redrafted, modified if needed and made available for public review and comment. The department reviews all public comments before making a decision about the permit. 

If a permittee submits a timely and sufficient application to renew a permit and, through no fault of the permittee, the department is unable to issue the renewed permit before the current permit expires, Code of State Regulations 10 CSR 20-6.015(10)(C) allows the permit to be administratively continued. The terms and conditions of the expired permit remain in effect until the department issues or denies the permit renewal. 

Currently Effective Permits

The following table contains electronic copies of all currently effective site-specific wastewater permits — not master general permits — issued by the department. This includes Concentrated Animal Feeding Operation (CAFO) permits, stormwater permits, wastewater permits and underground injection control well permits. These facilities have been authorized to either discharge to waters of the state, or to operate a no-discharge wastewater treatment facility. The department adds each site specific wastewater permit as it is issued. 

To sort the table below by field, click on the column headings in the table. You can also enter criteria in the search boxes to search for a specific wastewater permit. If you cannot find the information you are looking for, please submit an Open Records/ Sunshine Law Request.

*This is an "and" type search. All search criteria you enter must be met for the permit to appear in the results. If the permit you are searching for is not listed in the results, try again using less criteria.

Effective Date Between
Permit Number Applicant/ Facility County Effective Date Expiration Date Type
MO0095371 Joey Acres Subdivision Lincoln Operating
MO0125261 Patrick's Johnson Operating
MO0128228 50 Highway Development Inc. Johnson Operating
MO0118087 Oakwood Mobile Home Park Wastewater Treatment Facility Lincoln Operating
MO0109380 Crestview Mobile Home Park Pettis Operating
MO0082066 Woodstock Mobile Home Park Boone Operating
MO0119946 Bonnot Subdivision Wastewater Treatment Facility Miller Operating
MO0131377 Lake Ozark Speedway Wastewater Treatment Facility Miller Operating
MO0116173 Davidson Estates Wastewater Treatment Facility Taney Operating
MO0128287 Gilbane Rebuilders Boone Operating
MOARAR014 U.S. Environmental Protection Agency-Annapolis Lead Mine Site Iron Operating