Permits are required to build, erect, alter, replace, operate, use or maintain existing point sources of water pollution. A master general permit is one permit issued to multiple locations where activities are similar enough to be covered by a single set of requirements. However, most wastewater permits are site-specific, meaning one permit is issued to one location to reflect the unique nature of that specific wastewater, stormwater or the receiving water. 

As a permit nears its expiration, it is redrafted, modified if needed and made available for public review and comment. The department reviews all public comments before making a decision about the permit. 

If a permittee submits a timely and sufficient application to renew a permit and, through no fault of the permittee, the department is unable to issue the renewed permit before the current permit expires, Code of State Regulations 10 CSR 20-6.015(10)(C) allows the permit to be administratively continued. The terms and conditions of the expired permit remain in effect until the department issues or denies the permit renewal. 

Currently Effective Permits

The following table contains electronic copies of all currently effective site-specific wastewater permits — not master general permits — issued by the department. This includes Concentrated Animal Feeding Operation (CAFO) permits, stormwater permits, wastewater permits and underground injection control well permits. These facilities have been authorized to either discharge to waters of the state, or to operate a no-discharge wastewater treatment facility. The department adds each site specific wastewater permit as it is issued. 

To sort the table below by field, click on the column headings in the table. You can also enter criteria in the search boxes to search for a specific wastewater permit. If you cannot find the information you are looking for, please submit an Open Records/ Sunshine Law Request.

*This is an "and" type search. All search criteria you enter must be met for the permit to appear in the results. If the permit you are searching for is not listed in the results, try again using less criteria.

Effective Date Between
Permit Number Applicant/ Facility County Effective Date Expiration Date Type
MO0088536 Wyatt Wastewater Treatment Facility Mississippi Operating
MOGSE0564 Waters Edge Sewer Improvements Boone Construction
CP0002357 City of Moberly Digester Liner Replacement Randolph Construction
MOGSE0567 Northeast Outfall Sewer Replacement Phase 2 Perry Construction
MOGSE0566 West Village Apartments Jefferson Construction
MOGSE0561 Preserves at Sycamore Creek, The Camden Construction
MOGSE0544 Raintree Village Jackson Construction
MOGSE0562 Residences at Blackwell Jackson Construction
MOGSE0559 Madison Valley 2 and 3 Plats Cass Construction
CP0002361 Marchese Wastewater Treatment Facility Camden Construction
CP0002336 Shepherd of the Hills Development Wastewater Treatment Plant Taney Construction
MOGSE0536 Boulevard at Wilmer Valley Phase 2 St. Charles Construction
MOGSE0563 Elevate Branson Taney Construction
MOGSE0555 Gallatin Maintenance Complex Daviess Construction
MO0041190 Barnard Wastewater Treatment Facility Nodaway Operating
MO0129470 Box Canyon Watershed Wastewater Treatment Plant Stone Operating
MO0140121 Central Missouri Septic Service Franklin Operating
MO0097390 Clinton Wastewater Treatment Plant Henry Operating
MO0033901 Confluence Rivers-Freeman Hills Wastewater Treatment Facility Audrain Operating
MO0042013 Diamond Wastewater Treatment Facility Newton Operating
MO0130907 Dooley Lodges and Resort Stone Operating
MO0105449 Edgar Springs Wastewater Treatment Plant Phelps Operating
MO0134490 Jefferson County Public Sewer District-Brookside Parc Wastewater Treatment Plant Jefferson Operating
MO0045713 Jefferson County Public Sewer District-Brookstone Estates Subdivision Wastewater Treatment Facility Jefferson Operating
MO0109304 Jefferson County Public Sewer District-Cedar Springs Elementary School Wastewater Treatment Facility Jefferson Operating
MO0111431 Jefferson County Public Sewer District-Lakewood Wastewater Treatment Facility Jefferson Operating
MO0136468 Jefferson County Public Sewer District-Otto Express Mart Wastewater Treatment Facility Jefferson Operating
MOGS10624 Keeling Farm-Pual Peng Newton Operating
MO0055387 Middletown City Wastewater Treatment Facility Montgomery Operating
MO0130133 Pickering Wastewater Treatment Facility Nodaway Operating
MO0109916 Reel and Trigger Resort Wastewater Treatment Facility Benton Operating
MO0129267 Spring Lake Sewer Co. Wastewater Treatment Plant Adair Operating
MO0132349 Stone Ridge Meadows Subdivision Wastewater Treatment Facility St. Charles Operating
MO0129020 Stonehaven Estates Wastewater Treatment Plant Callaway Operating
MO0120456 Super 8 Lamar Wastewater Treatment Plant Barton Operating
CP0002351 Adventure Out RV Park Wastewater Treatment Facility Ralls Construction
MOGSE0565 Greenfield Estates Greene Construction
MOGSE0550 Majestic Lakes Phase 3A Lincoln Construction
CP0002356 Vision Condominiums Wastewater Treatment Facility Camden Construction
MOGSE0558 Jefferson County Library District NW Jefferson Construction
MOGSE0545 Elkhorn Ridge Warren Construction
CP0002353 Missouri-American Water Co.-Homestead Estates Wastewater Treatment Facility St. Louis Construction
MOGSE0556 Haven Pointe St. Charles Construction
MOGSE0540 Utility Relocation West Highway 54 Camden Construction
MOGSE0554 Autumn Ridge 4th Plat Cass Construction
MOGSE0549 Drake Homes Camden Construction
MOGSE0557 Greystone Subdivision Plat 10 Buchanan Construction
MO0128368 Bakersfield Wastewater Treatment Plant Ozark Operating
MO0085111 Belleview R-3 School District Wastewater Treatment Plant Iron Operating
MO0101184 Buckman North America-Cadet Plant Washington Operating