Weldon Spring Ordnance Works burning decon building
Demolition of the former Ordnance Works DNT and TNT building.

The Weldon Spring Ordnance Works site consists of about 17,232 acres located in St. Charles County, about 30 miles west of St. Louis and 14 miles southwest of the city of St. Charles. From 1941 to 1945, the site produced explosives for the U.S. Armed Services as part of the World War II defense effort. This site was one of the many munitions plants that manufactured trinitrotoluene (TNT) and dinitrotoluene (DNT). Wastes and wastewater from manufacturing operations were discharged onto the soil and drained into the watersheds of both the Mississippi and Missouri Rivers. The Weldon Spring Ordnance Works site was added to the Superfund National Priorities List (NPL) on Feb. 21, 1990.

Since 1959, a small part of the property has operated as the Weldon Spring Training Area for the Army Reserve and remains very active. The majority of the property became state-owned wildlife areas: August A. Busch Memorial and Weldon Spring Conservation Areas. Two hundred and twenty acres of the site is a separate NPL site, known as the Weldon Spring Site, which is owned by the U.S. Department of Energy. 

Missouri Department of Natural Resources’ Role

The department provides project oversight in conjunction with the U.S. Environmental Protection Agency (EPA). The department reviews annual groundwater monitoring reports to ensure the groundwater remedy is performing as designed. The department reviews five-year reviews to ensure remedies remain protective.

Information Repository

The information repository for the Weldon Springs Ordnance Works site, which contains additional site information and the community involvement plan for the site, is located at the St. Charles City-County Library's Middendorf-Kredell Branch, 2750 Highway K, O’Fallon, Missouri (during normal business hours). Additional site information and documents are also available on EPA's Weldon Spring Former Army Ordnance Works webpage.

Contacts

  • MoDNR Project Manager: 573-751-3907
  • EPA Project Manager: 913-551-7868
  • Department of Army Project Manager: 210-466-1886 

Overview

The Problem

TNT and DNT remain in the sub-surface soils in a small area of the site and pose a potential direct contact risk. Nitro-aromatic compounds, such as TNT, DNT and others remain in groundwater at concentrations above health-based standards. Groundwater at the site is not currently used for drinking water and groundwater sampling and monitoring is performed to ensure contaminated groundwater is not impacting potential receptors.

Contaminants of Concern

Nitro-aromatics (primarily TNT and DNT), lead, polychlorinated biphenyls (PCBs) and polycyclic aromatic hydrocarbons were contaminants of concern at the former Weldon Springs Ordnance Works site. Following soil cleanup at the site, all previously contaminated areas met a recreational use standard. Nitro-aromatic contamination of groundwater remains above drinking water standards but is declining.

What’s Been Done

Institutional controls have been implemented to prevent exposure to the subsurface soil contamination. Nitro aromatic contaminated soil and wooden wastewater pipeline has been excavated and incinerated. Lead contaminated soils were excavated, stabilized and placed in a disposal cell. Other soil contaminants were incinerated or disposed off-site.

What’s Left

Groundwater at the site is currently sampled and monitored to ensure contaminated groundwater is not impacting potential receptors.

  • Monitor breakdown of nitro-aromatic contamination in groundwater until cleanup goals are met
  • Complete groundwater institutional controls

Looking to the Future

Cleanup of soil at the site allows for all reuse except residential. Groundwater consumption will be restricted until the groundwater cleanup is completed. 

Details

Site Description 

The Weldon Spring Ordnance Works site is located in St. Charles County, about 30 miles west of St. Louis and about 14 miles southwest of the city of St. Charles. The original site property consisted of 17,232 acres and is bordered by U.S. Interstate 64 to the north and the Missouri River to its south. The U.S. Army acquired the site property in late 1940. From 1941 to 1945, the U.S. Army produced TNT and DNT in support of World War II. The facility included 18 TNT production lines and two DNT production lines.

Following deactivation of the production facility, the majority of the site property was transferred to the state of Missouri and local entities. Of the original Weldon Spring Ordnance Works site property, 1,655 acres remain in Army hands and has been operated as the Weldon Spring Training Area for the Army Reserve since 1959. Fifteen thousand acres became state-owned wildlife areas, August A. Busch Memorial and Weldon Spring Conservation Areas. Two hundred and twenty acres are now a separate NPL site, the Weldon Spring Site, which is owned by the U.S. Department of Energy. The Weldon Spring Training Area, August A. Busch Memorial and Weldon Spring Conservation Areas and a former Missouri Department of Transportation Depot collectively make up the Weldon Spring Ordnance Works site.

The Problem

Soils and pipeline contaminated with explosive materials and breakdown products posed a threat to human health and the environment, particularly groundwater. Numerous past releases of wastes and wastewater from manufacturing operations to the soil and shallow subsurface contaminated groundwater both on and off-site. These wastes also drained into the watersheds of both the Mississippi and Missouri Rivers. Today, DNT, TNT and other nitro-aromatic compounds located in soil and groundwater are the main contaminants of concern at the site. Lead in soil, nitrobenzene in groundwater, polychlorinated biphenyls (PCBs) and polycyclic aromatic hydrocarbons (PAHs) in the soil are other contaminants that affect the site.

Environmental Restoration

Cleanup of the site was conducted under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The Weldon Spring Ordnance Works site was added to the NPL on Feb. 21, 1990. The department, EPA and the U.S. Army entered into a federal facilities agreement Aug. 8, 1991, which defines the regulatory framework between the three agencies. The Army is the lead agency responsible for planning and implementing the response action. EPA and the department provide regulatory oversight of the Army.

Operable Units (OUs) are separate activities undertaken as part of a Superfund site cleanup. The cleanup project was executed in two OUs: the soil and pipeline at the site (OU-1) and the groundwater (OU-2). The Army and EPA signed the record of decision for the selected remedy for OU-1 on Sept. 26, 1996. The selected remedy included excavating and incinerating nitroaromatic-contaminated soils and wooden pipeline and stabilizing lead-contaminated soil. A phased remedial action began in 1998, and included excavating and incinerating affected pipelines, soils and other wastes; treating lead-impacted soils; and restoring the site property. The nitro-aromatic contaminated soils and pipeline incineration was completed in 1999. Construction debris, lead stabilized soils, PAH contaminated soils and soils containing less than 50 parts per million of PCBs were placed in the disposal cell at the nearby Weldon Spring site.

In 2003, an excavation was conducted to a depth of 22 feet below ground surface near a former production building in the center of the Training Area, known as T13. Confirmation samples collected at the bottom of the  excavation and along the sidewalls showed nitro-aromatic contamination in the soil exceeded remediation goals. In 2004, the U.S Army Corps of Engineers produced an explanation of significant differences report, which modified the selected remedy and documented an increase in soil amounts. This caused an increase in both remediation time and cost. Additional materials were incinerated and placed in the Weldon Spring disposal cell. The amount of materials disposed off-site was more than anticipated at the time of remedy selection.

On Sept. 30, 2004, the U.S. Army, U.S Army Corps of Engineers, EPA and the department signed the record of decision for the selected remedy for OU-2. The selected remedy includes monitored natural attenuation with institutional controls. Natural attenuation involves a variety of physical, chemical or biological in-place processes that, under favorable conditions, act without human intervention to reduce the mass, toxicity, mobility, volume or concentration of contaminants in groundwater. The Army implemented the monitoring part of the remedy, but the institutional controls for the site have not been fully implemented.

What’s Left 

Groundwater monitoring is conducted annually and includes a groundwater monitoring network of seven springs and 17 groundwater monitoring wells. Monitoring will continue until the groundwater remedial goals are met. 

Looking to the Future

Five-year reviews are conducted at sites to evaluate the protectiveness of remedial actions where hazardous substances, pollutants or contaminants remain above levels that allow for unlimited use and unrestricted exposure. The fourth and most recent five-year review was completed on Sept. 30, 2020. The Army issued a protectiveness statement in the review report. The EPA generally agreed with the Army’s protectiveness determination, but did not agree with the protectiveness statements. EPA has final authority over the protectiveness statements and exercised this authority by issuing independent protectiveness statements for each OU and the entire site. The protectiveness statements EPA reported to Congress were as follows:

  • The remedy at OU-1 is currently protective of human health and the environment. Remedial actions occurred to eliminate ingestion of and skin exposure to contaminated soils. Contaminated soils remain in the subsurface at some site locations. Contaminants that remain above cleanup goals are located below ten feet and do not present a completed pathway to humans. The OU-1 remedy did not allow for soils above the remediation goals to remain in place. As a result, the Army will amend the current remedy in 2021 to address the remaining contaminated soils.
  • The remedy at OU-2 is currently protective of human health and the environment.
  • Remedies at the site are currently protective of human health and the environment. Cleanup actions occurred to eliminate ingestion of, and skin exposure to, contaminated soils. Contaminated soils remain in the subsurface at some site locations, but the contamination is located below 10 feet and does not present a completed pathway to humans. The Army will amend the current remedy for OU-1 in 2021 to address the remaining contaminated soils.