The Missouri Department of Natural Resources describes an Electronic, Electrical Equipment and Components business as:

A business that primarily manufactures electronic supplies and equipment including wires, transistors, insulators, electric motors, circuite boards and other electrical fixtures.

You may need some or all of the following permits for an Electronic, Electrical Equipment and Components business:

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Minor Construction Permit Section (5)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Water icon
Fabricating Metal, Light Industrial Master General Stormwater Permit MOR203000

If your business operates a ferrous and nonferrous foundry, casting, extrusion, rolling, galvanizing and finishing, structural steel production, light metal fabrication and electrical equipment manufacturing, you must obtain a Fabricating Metal, Light Industrial General Stormwater Permit MOR203000 to address stormwater discharges from the property.

Waste icon
Hazardous and Solid Waste Amendments Part 2 Permit

This is one of two possible permits that make up a hazardous waste permit. A Hazardous and Solid Waste Amendments Part 2 Permit contains the federal hazardous waste management regulations administered by EPA that Missouri has either not adopted or has adopted but EPA has not yet given Missouri temporary or final authorization to administer. This "Part 2" permit is issued by EPA, if warranted. EPA does not issue a Part 2 Permit if EPA has no site-specific conditions for that particular facility. Please visit the Hazardous Waste Permit.

Waste icon
Hazardous Waste Generator Registration

If you produce or store some form of hazardous waste as a result of your business processes, you may be required to register as a hazardous waste generator.

Waste icon
Hazardous Waste Permit

If you want to actively treat, store (for more than 90 days) or dispose of hazardous waste in Missouri, you are required to get a Hazardous Waste Permit. Certain “inactive” hazardous waste treatment, storage or disposal facilities may also be required to obtain a permit in order to investigate, monitor and clean up hazardous waste release to the environmental at their facility.

Waste icon
Hazardous Waste/ Infectious Waste Transporter License

If you or your business plans to transport hazardous waste including waste oil, explosives, gases, flammable and combustible liquids, flammable solids, oxidizers and organic peroxides, poisons, radioactive materials, corrosives or infectious waste, you must obtain a Hazardous/ Infectious Waste Transporter License.

Water icon
Hydrostatic Testing of Pipelines and Storage Tanks Permit MOG670000

If you or your business plans to conduct hydrostatic testing of petroleum-related oil and gas pipelines and storage tanks, you must obtain a Hydrostatic Testing of Pipelines and Storage Tanks MOG670000 master general permit.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Waste icon
Missouri Hazardous Waste Management Facility Part 1 Permit

This is one of two possible permits that make up a hazardous waste permit. A Missouri Hazardous Waste Management Facility Part 1 Permit contains the federal hazardous waste management regulations Missouri adopted and EPA authorized Missouri to administer. This "Part 1" permit is issued by the Missouri Department of Natural Resources to all facilities obtaining a hazardous waste permit. Please go to Hazardous Waste Permit.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Site-Specific Industrial Wastewater Operating Permit

If your business plans to discharge wastewater from a manufacturing process, you will need to apply for a Site-Specific Industrial Wastewater Operating Permit before you may operate, use or maintain the existing point source of water pollution. A Wastewater Construction Permit is required if constructing an earthen basin.