The Missouri Department of Natural Resources describes a Concentrated Animal Feeding Operation business as:
An operation is defined as an animal feeding operation (AFO) if the facility confines, stables or feeds animals for 45 days or more in a 12-month period and a ground cover of vegetation is not sustained over at least 50% of the confinement area. An operation is defined as a concentrated animal feeding operation (CAFO) if it meets the definition of an animal feeding operation and also confines more than 1,000 animal units (1,000 animal units is equal to 2,500 swine, 100,000 broilers, 700 dairy cows or 1,000 beef steers).
An operation's class size is a category that is based upon the total number of animal units confined at an operation. The Class 1C, 1B and 1A are categories that start at 1,000, 3,000 and 7,000 animal units respectively and are required by state regulation to obtain a permit.
You may need some or all of the following permits for a Concentrated Animal Feeding Operation business:
|
Air Intermediate Operating Permit
If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions. |
|
Air Major Construction Permit Sections (7), (8) & (9)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions. |
|
Air Minor Construction Permit Section (5)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions. |
|
Air Part 70 Operating Permit
If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit. |
|
Air Permits-by-Rule Construction Permit
If your business operates a printing operation, crematory or animal incinerator, surface coating or livestock market, you may require an Air Permit-by-Rule Construction Permit to address potential air emissions. By applying for this permit rather than a De Minimis or Minor Construction Permit, your business agrees to certain conditions of operation. |
|
In-Stream Sand and Gravel Mining Permit
If your business plans to engage in surface mining of industrial minerals such as sand, gravel, limestone, dolomite, clay or other construction aggregates, you may need an Industrial Mineral Mines Permit – In-stream Sand and Gravel Mining to engage in surface mining. |
|
Land Application of Domestic Wastewater Permit MOG823000
If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit. |
|
Metallic Mineral Waste Management Permit
If your business plans to process metallic minerals or mineral ores that contain lead, iron, silver, gold, zinc or copper and that process produces waste such as waste rock, mine water, tailings or chat, you may need a Metallic Mineral Waste Management Permit |
|
Open Pit Mining Permit
If your business plans to remove topsoil and other soil material to expose the mineral commodity, you may need an Industrial Minerals Mines Permit - Open Pit Mining. Industrial mineral open pit mine sites range in size from one acre sand and gravel pits to 1,000 acre limestone sites. |
|
Public Drinking Water Construction Permit
If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Public Drinking Water Permit to Dispense
If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Remedial Action Plan
If you want to treat, store or dispose of hazardous remediation waste at a remediation waste management site in Missouri, you may be required to follow a Remedial Action Plan. The plan lists conditions about how to treat, store or dispose of hazardous remediation waste. |
|
State No-Discharge Concentrated Animal Feeding Operation (CAFO) Permit MOGS10000
If your business is a Class I CAFO or Class II Animal Feeding Operation that are defined as a CAFO, you must obtain a State No-Discharge Concentrated Animal Feeding Operation MOGS10000 master general permit. |