The Missouri Department of Natural Resources describes an Asphalt Paving business as:

A business primarily engaged in manufacturing asphalt and tar paving mixtures and paving blocks made of asphalt and various competitions of asphalt or tar with other materials.

You may need some or all of the following permits for an Asphalt Paving business:

Waste icon
Above Ground Storage Tank Registration

Above ground storage tanks are regulated by the Missouri Department of Agriculture. For more information, please visit their Fuel Device Safety and Accuracy Program webpage.

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Minor Construction Permit Section (5)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Waste icon
Hazardous Waste Generator Registration

If you produce or store some form of hazardous waste as a result of your business processes, you may be required to register as a hazardous waste generator.

Waste icon
Hazardous Waste/ Infectious Waste Transporter License

If you or your business plans to transport hazardous waste including waste oil, explosives, gases, flammable and combustible liquids, flammable solids, oxidizers and organic peroxides, poisons, radioactive materials, corrosives or infectious waste, you must obtain a Hazardous/ Infectious Waste Transporter License.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Waste icon
Underground Petroleum Storage Tank Registration

If your business includes an underground storage tank on the property used to store either petroleum or certain hazardous substances, or if you plan to have a tank installed for these reasons, you may be required to submit an Underground Storage Tank Registration with the department.