The Missouri Department of Natural Resources describes a School business as:

An institution where academic or technical instructions are given to students. Also included are establishments proving educational services such as libraries, student exchange programs and curriculum development. 

You may need some or all of the following permits for a School business:

Air icon
Asbestos Renovation and Demolition Notification

The department requires notification of demolitions and abatement projects involving regulated structures at least 10 working days before crews begin a project. To learn more, visit the department's Asbestos webpage.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Waste icon
Scrap Tire Processing Facility Permit

If your business plans to operate a facility to reduce the volume of scrap tires by shredding, cutting, buffing, chipping, baling or otherwise altered so they can be recycled, used for resource recovery or disposed of, you will be required to apply for a Scrap Tire Processing Facility Permit.

Water icon
Sewer Extension Construction Permit

If your business plans to construct a gravity sewer extension, force main and lift station, you may need a site-specific Sewer Extension Construction Permit. You may also need this permit if you plan to construct a non-earthen flow equalization storage basin at a lift station and an inline storage.

Water icon
Site-Specific Domestic Wastewater Operating Permit

If you or your business has received a Wastewater Construction Permit for domestic wastewater discharges and have completed the construction project, you will need to apply for a Site-Specific Domestic Wastewater Operating Permit before you may operate, use or maintain the existing point source of water pollution. 

Waste icon
Solid Waste Processing Facility Construction Permit

If your business plans to build a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Construction Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting.

Waste icon
Solid Waste Processing Facility Operating Permit

If your business plans to operate a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Operating Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting.

Waste icon
Solid Waste Technician Certification

Missouri solid waste disposal areas and solid waste processing facilities designated by rule, must be operated under the direction of a certified solid waste technician. For more information, please visit the department's Solid Waste Technician Certification webpage.

Water icon
Wastewater Construction Permit

If your business plans to build, erect, alter or replace an existing or proposed point source, water contaminate source or wastewater treatment facility, you may need a Wastewater Construction Permit.