The Missouri Department of Natural Resources describes a Land Transportation and Warehouse business as:
A business used to transport or move people, animals or goods from one location to another location on land. A warehouse is a storage facility used to process and move goods on to wholesalers, retailers or consumers.
You may need some or all of the following permits for a Land Transportation and Warehouse business:
|
Hazardous Waste/ Infectious Waste Transporter License
If you or your business plans to transport hazardous waste including waste oil, explosives, gases, flammable and combustible liquids, flammable solids, oxidizers and organic peroxides, poisons, radioactive materials, corrosives or infectious waste, you must obtain a Hazardous/ Infectious Waste Transporter License. |
|
Land Application of Domestic Wastewater Permit MOG823000
If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit. |
|
Motor Freight Transportation Master General Stormwater Permit MOR80C000
If your business is engaged in motor freight, watercraft transportation, motorized vehicle maintenance and repair, warehousing activities, railways and U.S. Postal Service maintenance facilities, you are required to obtain a Motor Freight Transportation Master General Stormwater Permit MOR80C000 to address stormwater discharges from the property. |
|
Public Drinking Water Construction Permit
If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Public Drinking Water Permit to Dispense
If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Section 401 Water Quality Certification
If your business plans to perform any work in a waterway or wetland, you may be required to submit a Section 401 Water Quality Certification. Contact the appropriate U.S. Army Corps of Engineers district to determine if a federal permit is required. If there is no federal permit required, then you are not required to obtain a 401 Water Quality Certification from the department. |