The Missouri Department of Natural Resources describes an Infectious Waste Treatment Facility business as:
A business that receives and treats a small subset of medical or healthcare waste. This waste is capable of producing an infectious disease because it contains strong and numerous enough pathogens that someone who comes in contact with it could get an infectious disease from it. Infectious waste is found in healthcare facilities, such as hospitals, doctor’s offices, dental offices, research laboratories and veterinary clinics. Infectious waste is also found in non-medical settings, such as schools, hotels, motels, tattoo shops and manufacturing businesses. It can also be found in our own homes.
You may need some or all of the following permits for an Infectious Waste Treatment Facility business:
|
Above Ground Storage Tank Registration
Above ground storage tanks are regulated by the Missouri Department of Agriculture. For more information, please visit their Fuel Device Safety and Accuracy Program webpage. |
|
Air Intermediate Operating Permit
If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions. |
|
Air Major Construction Permit Sections (7), (8) & (9)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions. |
|
Air Minor Construction Permit Section (5)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions. |
|
Air Part 70 Operating Permit
If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit. |
|
Land Application of Domestic Wastewater Permit MOG823000
If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit. |
|
Public Drinking Water Permit to Dispense
If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Solid Waste Processing Facility Construction Permit
If your business plans to build a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Construction Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting. |
|
Solid Waste Processing Facility Operating Permit
If your business plans to operate a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Operating Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting. |
|
Solid Waste Technician Certification
Missouri solid waste disposal areas and solid waste processing facilities designated by rule, must be operated under the direction of a certified solid waste technician. For more information, please visit the department's Solid Waste Technician Certification webpage. |
|
Underground Petroleum Storage Tank Registration
If your business includes an underground storage tank on the property used to store either petroleum or certain hazardous substances, or if you plan to have a tank installed for these reasons, you may be required to submit an Underground Storage Tank Registration with the department. |