The Missouri Department of Natural Resources describes a Fish Hatchery business as:

A facility used to artificially breed, hatch and rear through the early life stages of fish.

You may need some or all of the following permits for a Fish Hatchery business:

Water icon
Fish Farms/ Hatcheries Permit MOG130000

If your business plans to operate a flow-through concentrated aquatic animal production facility, you must obtain a Fish Farms/ Hatcheries MOG130000 Master General Permit.

Geological Survey Program Contact Us icon
In-Stream Sand and Gravel Mining Permit

If your business plans to engage in surface mining of industrial minerals such as sand, gravel, limestone, dolomite, clay or other construction aggregates, you may need an Industrial Mineral Mines Permit – In-stream Sand and Gravel Mining to engage in surface mining.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Water icon
Major Water User Registration

If you or your business is capable of producing 100,000 gallons per day, or approximately 70 gallons per minute, including all wells or surface intakes, you are required to register with the department as a Major Water User. This registration is not for permitting purposes or to regulate water usage. Major water users are required by law to report the volume of water they used by March 31 of the year following the usage. Registration is required in order to submit reports.

The Major Water Users Program is established to simply gather water use data. Missouri collects water use data to better understand and manage the state’s water inventory. For more information, or to complete the online registration, please visit the Major Water Users webpage.

Geological Survey Program Contact Us icon
Open Pit Mining Permit

If your business plans to remove topsoil and other soil material to expose the mineral commodity, you may need an Industrial Minerals Mines Permit - Open Pit Mining. Industrial mineral open pit mine sites range in size from one acre sand and gravel pits to 1,000 acre limestone sites.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Waste icon
Remedial Action Plan

If you want to treat, store or dispose of hazardous remediation waste at a remediation waste management site in Missouri, you may be required to follow a Remedial Action Plan. The plan lists conditions about how to treat, store or dispose of hazardous remediation waste.